Overview
Talimarjan Power Plant 1 LLC (TPP1) owns a power plant consisting of two gas-fired CCGT units with total installed capacity of 900 MW commissioned in 2016 and 2017, as well as associated shared facilities and auxiliary assets.
The plant is located in the town of Nuristan in the Kashkadarya Region of the Republic of Uzbekistan. The operations and maintenance of the plant is performed by Talimarjan Operations and Maintenance LLC.
TAQA owns 40% participation in the project along with partners Mubadala (40%) and JSC Talimarjan Issiqlik Elektr Stansiyasi (20%).